Dalahoo combined cycle power plant

Inaugurating the Second unit of gas of  Dalahoo Combined Cycle Power Plant in Kermanshah by order of the President via video conference

Inaugurating the Second unit of gas of Dalahoo Combined Cycle Power Plant in Kermanshah by order of the President via video conference

The Second unit of gas of  Dalahoo Combined Cycle Power Plant in Kermanshah, was operated by permission of the President “Hasan Rouhani” via video conference at the project site on Thursday, 3rd September (2020). According to Public Relations of Farab Co., Dalahoo CCPP has a nominal capacity of 910 MW and consists of two 310-MW […]

Read more
Honoring CEO of Farab company and introducing Dalahoo power plant project as a premier concrete project

Honoring CEO of Farab company and introducing Dalahoo power plant project as a premier concrete project

Board of directors of American Concrete Institute (ACI) – Iran Branch and Concrete Research Center (MTB) introduced Dalahoo Combined Cycle Power Plant’s ACC structure with concrete base as a »premier concrete project« and honored CEO of Farab Co. as a »top figures in construction industry«. According to Public Relations of Farab Co., Dr. »Ali Vakili«, […]

Read more

Enter your keyword