Opening of water transfer tunnel from Azad Dam with a length of 11 km in Kurdistan province

Opening of water transfer tunnel from Azad Dam with a length of 11 km in Kurdistan province

Opening of water transfer tunnel from Azad Dam with a length of 11 km in Kurdistan province

 

The end tunnel of the water transfer system from Azad Dam to Ghocham Dam with a length of 11 km, was inaugurated by order of the Minister of Energy via video conference with the presence of Kurdistan Governor and CEO of Iran Water and Power Resources Development Co. in the location of this project on Tuesday, May 25 th (2021).

According to Public Relations of Farab Company, the project of the final tunnel of the water transfer system from the Azad Dam includes 11 kilometers of mechanized tunnels and inlet and outlet structures.

The tunnel was excavated by Farab Co. with an EPB machine, TBM type, provided by “Herrenknecht” Co., and the project was designed by Farab Engineering Deputy.

Related Posts

Enter your keyword