Azad hydro power plant

Project Info
  • Client: Iran Water & Power Resources Development Co.
  • Main Contractor: Farab
  • Location: Kurdistan, Iran
  • Scheme: BOT
  • Scope: Electromechanical & hydromechanical equipment work, power house and waterways construction
  • Progress: Completed
  • Specification:
    • Capacity: 10 MW (3 Units of 3.3 MW)
    • Type of power house: Surface
    • Average annual power generation: 51.4 GWh
    • Main equipment:
      • Turbine: Horizontal Francis, 1000 rpm
      • Generator: Synchronous type, 6.3 KV
      • Butterfly valve: 0.8 m inner outlet diameter
      • Governor: Electrohydraulic governors, 76 bar
      • Transformer: Three phase step up Transformers, 63 KV
      • Switchyard: 63 KV
      • Crane: One power house main crane, 30 tons

Role of Farab Equipment Manufacturing Co.

  • Design and manufacturing management of turbine
  • Design, material supply, manufacturing management and installation of draft tube gates, penstock and embedded parts
  • Design, procurement and installation of crane

Role of Farab Construction Co.

  • Installation of electromechanical & hydromechanical equipment, precommissioning and commissioning

Role of Farab Operations and Maintenance Co.

  • Power plant operation, maintenance and repair