Project Info
  • Client: Iran Water & Power Resources Development Co.
  • Main Contractor: Farab
  • Location: Khuzestan, Iran
  • Scheme: EPC
  • Scope: Electromechanical & hydromechanical equipment
  • Progress: Completed
  • Capacity: 400 MW (3 units of 133.3 MW)
  • Type of power house: Surface
  • Average annual power generation: 934 GWh
  • Main equipment:
    • Turbine: Vertical Francis, 155 rpm, 560 tons each
    • Generator: Synchronous type, 13.8 KV
    • Butterfly valve: 5.3 m inner outlet diameter
    • Governor: Digital type with digital backup governors, 75 bar
    • Generator busduct: Insulated phase busducts, 15.75 KV and 11.5 KA
    • Transformer: Three phase step up transformers, 160 MVA
    • Hydraulic steel structure: Stoplog gates
    • Crane: Two power house main cranes, 225 tons each