Mashhad urban railway line 2

Project Info
  • Client: Mashhad Urban Railway Co.
  • Main Contractor: Farab
  • Location: Razavi Khorasan, Iran
  • Scheme: EPC
  • Scope: Fleet and lectromechanical equipment
  • Progress: Under construction
  • General Specification:
    • Length: 14.85 km (underground length: 14.4 km)
    • Underground stations: 13
    • Line capacity: 24,000 passengers per hour per direction
    • Length stations: 120 m
  • Main equipment:
    • Rolling stock: 20 trains, 100 cars
    • Power supply
    • Communication system
    • Fire alarm system
    • Signaling system
    • Control & SCADA & BMS
    • Operating control center (OCC)
    • Depot equipment & auxiliary vehicle & track maintenance equipment
    • Tunnel ventilation
    • Escalators

Role of Farab Equipment Manufacturing Co.

  • Material supply and local manufacturing management of 112 diffusers

Role of Farab Construction Co.

  • Mobilization and installation of electromechanical equipment

Related News:

Enter your keyword