Tehran urban railway line 7
Utility and offsite units of Bushehr Petrochemical Complex
Engineering of utility & offsite units of Bushehr Petrochemical project, Phases 2 &3 and engineering procurement support, Consist of: Water treatmnet, cooling towers unit, air and nitrogen unit, steam generation unit Fire fighting system Piping interconnecting Electric power distribution, emergency diesel generator, telecom, control & instrumentation Buildings (substation, control, workshop, secuirity, firefighting, etc) Storage tanks
South pars steam turbine power plant and water desalination plant
Terem hydro power plant
Sardasht hydro power plant
Azad pumped storage power plant
Specification: Capacity: 510 MW (3 Units of 170 MW) Type of power house: Underground Main equipment: Turbine: Vertical Francis pump-turbine, rated 500 rpm, 2 with single speed and 1 with variable speed Generator: 2 synchronous and 1 double-fed asynchronous, each of 185 MVA, 15.5 KV Inlet valve: 3 spherical type Governor: 3 electro-hydraulic governors for […]
Pardis petrochemical Complex (Phase 3- Ammonia & Utility)
Azad water conveyance tunnel
Specification: Type of tunnel: Mechanized concrete tunnel for water transfer Capacity: 5 m3/sec. passing flow Main volume: Precast concrete segment: 54,200 pieces in 9,034 rings, each ring consist of 6 segments Concrete volume: 35,000 m3 including lining and grouting Reinforcement: 1,800 tons Open excavation volume: 550,000 m3 Tunnel excavation volume: 120,000 m3 in hard and […]