Sangtuda 2 dam and hydro power plant

Project Info
  • Client: Barqi Tojik
  • Main Contractor: Farab
  • Location: Khatlan Province, Tajikistan
  • Scheme: BOOT
  • Scope: Electromechanical & hydromechanical equipment, dam construction and spillway and power house civil work
  • Specification:
    • Capacity: 220 MW (2 Units of 110 MW)
    • Type of power house: Surface
    • Average annual power generation: 1000 GWh
    • Main equipment:
      • Turbine: Vertical Kaplan, 72 rpm
      • Generator: Synchronous type, 13.8 KV
      • Governor: Digital type governors, 63 bar
      • Busduct: Air busducts, 13.8 KA
      • Transformer: Three phase step up Transformers, 125 MVA
      • Switchgear: 220 KV
      • Crane: Two power house main cranes, 350 tons each

Role of Farab Equipment Manufacturing Co.

  • Material Supply and Local Manufacturing Management of:
    • Generator (Stator frame, rotor rim sheet)

Role of Farab Construction Co.

  • Installation of electromechanical & hydromechanical equipment, precommissioning and commissioning

Role of Farab Operations and Maintenance Co.

  • Power plant operation, maintenance and repair