Terem hydro power plant

Project Info
  • Client: Regen Terem SHPP Limited
  • Main Contractor: Farab
  • Location: Bungoma, Kenya
  • Scheme: EPC
  • Scope: Electromechanical & hydromechanical equipment, dam, penstock and power house civil work
  • Progress: Completed
  • Specification:
    • Capacity: 5.2 MW (2 Units of 2.6 MW)
    • Type of power house: Surface
    • Main equipment:
      • Turbine: Vertical Pelton, 750 rpm
      • Generator: Synchronous type, three phase 3.3 KV
      • Butterfly valve: 0.7 m inner outlet diameter
      • Governor: Hydraulic power unit, 250 bar
      • Transformer: Three phase step up transformers, 33 KV, 3 MVA
      • Crane: One power house main crane, 20 tons

Role of Farab Equipment Manufacturing Co.

  • Design, material supply, manufacturing management and installation of radial gate and stoplog gates
  • Design, procurement and installation of crane

Role of Farab Construction Co.

  • Management contracting
  • Installation of electromechanical & hydromechanical equipment, precommissioning and commissioning