{"id":9851,"date":"2017-02-25T06:47:29","date_gmt":"2017-02-25T03:17:29","guid":{"rendered":"http:\/\/test-s.ir\/a\/?p=9851"},"modified":"2019-07-10T13:49:46","modified_gmt":"2019-07-10T09:19:46","slug":"commissioning-of-the-1st-unit-of-terem-hpp-project-in-kenya","status":"publish","type":"post","link":"https:\/\/www.farab.com\/en\/commissioning-of-the-1st-unit-of-terem-hpp-project-in-kenya\/","title":{"rendered":"Commissioning of the 1st Unit of Terem HPP project in Kenya"},"content":{"rendered":"<p>The first unit of <span dir=\"RTL\">\u00bb<\/span> Terem Hydro Power Plant<span dir=\"RTL\">\u00ab<\/span> in Kenya was successfully connected to the power grid of this country.<\/p>\n<p>According to Public Relations of Farab Co., Engineer <span dir=\"RTL\">\u00bb<\/span>Mehran Lotfi<span dir=\"RTL\">\u00ab<\/span>, Managing Director of the company, announced this news and said that: Terem Hydro Power Plant is accounted as the 3rd project of exporting technical and engineering services to Kenya.<\/p>\n<p>He added that \u201cTerem Hydro Power Plant has two 2.5MW units which are located at the west of this country. REGEN Co. is the employer and Farab Co. is the EPC contractor of this project\u201d.<\/p>\n<p>He referred to African Continent as one of the potential and important markets for Farab Co. and said that: \u201csince 2007, when Farab specialists initiated working in African Continent, the company has been successful in running <span dir=\"RTL\">\u00bb<\/span>Tana<span dir=\"RTL\">\u00ab<\/span> 25MW Hydro Power Plant, <span dir=\"RTL\">\u00bb<\/span>Kindaruma<span dir=\"RTL\">\u00ab<\/span> construction and Hydro-mechanical Power Plant, and <span dir=\"RTL\">\u00bb<\/span>Terem<span dir=\"RTL\">\u00ab<\/span> Hydro Power Plant projects in Kenya.<\/p>\n<div id='gallery-1' class='gallery galleryid-9851 gallery-columns-3 gallery-size-thumbnail'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.farab.com\/en\/wp-content\/uploads\/2017\/02\/01.jpg'><img width=\"150\" height=\"150\" src=\"https:\/\/www.farab.com\/en\/wp-content\/uploads\/2017\/02\/01-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" loading=\"lazy\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.farab.com\/en\/wp-content\/uploads\/2017\/02\/02.jpg'><img width=\"150\" height=\"150\" src=\"https:\/\/www.farab.com\/en\/wp-content\/uploads\/2017\/02\/02-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" loading=\"lazy\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.farab.com\/en\/wp-content\/uploads\/2017\/02\/03.jpg'><img width=\"150\" height=\"150\" src=\"https:\/\/www.farab.com\/en\/wp-content\/uploads\/2017\/02\/03-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" loading=\"lazy\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.farab.com\/en\/wp-content\/uploads\/2017\/02\/04.jpg'><img width=\"150\" height=\"150\" src=\"https:\/\/www.farab.com\/en\/wp-content\/uploads\/2017\/02\/04-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" loading=\"lazy\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>The first unit of \u00bb Terem Hydro Power Plant\u00ab in Kenya was successfully connected to the power grid of this country. According to Public Relations of Farab Co., Engineer \u00bbMehran Lotfi\u00ab, Managing Director of the company, announced this news and said that: Terem Hydro Power Plant is accounted as the 3rd project of exporting technical [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11281,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1,1089,1183],"tags":[],"_links":{"self":[{"href":"https:\/\/www.farab.com\/en\/wp-json\/wp\/v2\/posts\/9851"}],"collection":[{"href":"https:\/\/www.farab.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.farab.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.farab.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.farab.com\/en\/wp-json\/wp\/v2\/comments?post=9851"}],"version-history":[{"count":2,"href":"https:\/\/www.farab.com\/en\/wp-json\/wp\/v2\/posts\/9851\/revisions"}],"predecessor-version":[{"id":11282,"href":"https:\/\/www.farab.com\/en\/wp-json\/wp\/v2\/posts\/9851\/revisions\/11282"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.farab.com\/en\/wp-json\/wp\/v2\/media\/11281"}],"wp:attachment":[{"href":"https:\/\/www.farab.com\/en\/wp-json\/wp\/v2\/media?parent=9851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.farab.com\/en\/wp-json\/wp\/v2\/categories?post=9851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.farab.com\/en\/wp-json\/wp\/v2\/tags?post=9851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}