Nar gas compressor station

portfolio
portfolio
Project Info
  • Client: Iranian Central Oil Field Co.
  • Main Contractor: Farab
  • Location: Bushehr, Iran
  • Scheme: EPC
  • Scope: Electromechanical equipment
  • Progress: Completed
  • General specification:
    • Turbine Type: Cyclone SGT – 400 Siemens
    • Design Pressure: 1450 psia
    • Maximum Compressor Discharge Pressure: 1311 psia
    • ISO Rating: 13.4 MW
    • Synchronous Speed: 9500 rpm
    • Maximum Station Discharge: 36.2 MMSCMD
    • Pipelines: 8 Km

Role of Nardis Energy Projects Co.

  • Management contracting

Enter your keyword