Dalahoo combined cycle power plant

portfolio
portfolio
Project Info
  • Client: Islam Abad Power Generation Co.
  • Main Contractor: Farab
  • Location: Kermansshah, Iran
  • Scheme: BOO
  • Scope: Electromechanical equipment and civil works
  • Progress: Under construction
  • Specification:
    • Capacity at ISO conditions: 910 MW (2 Units of 310 MW & 1 Unit of 290 MW)
    • Fuel type: Natural gas/ gas oil
    • Grid voltage: 400 KV
    • Site conditions:
      • Altitude: 1348 m.a.s.l
      • Maximum ambient temperature: 13.5° C
      • Maximum relative humidity: 49.7%

Role of Farab Equipment Manufacturing Co.

  • Quality Control and Inspection of HRSG
  • Procurement of ACC steam duct

Role of Farab Construction Co.

  • Engineering, procurement and construction of 33,000 m3 storage tank
  • Construction of power plant road with a length of 2,000 meters

Role of Farab Operations and Maintenance Co.

  • Power plant commissioning
  • Power plant operation, maintenance and repair