- Specification:
- Capacity: 37.6 MW (2 Units of 18.8 MW)
- Type of power house: Surface
- Main equipment:
- Turbine: Vertical Kaplan, 142.8 rpm
- Generator: Synchronous type, 11 KV
- Governor: Digital electronic frequency governors, 60 bar
- Crane: One power house main crane, 150 tons
Project Info
- Client: Regional Ministry of Electricity in Kurdistan Republic of Iraq
- Main Contractor: Farab- Boland Payeh JV
- Location: Dohuk province, Iraq
- Scheme: EPC
- Scope: Electromechanical & hydromechanical equipment
- Progress: Under construction
Role of Farab Equipment Manufacturing Co.
- Design, material supply, manufacturing management and installation of radial gate, trash rack and trash rack cleaning machine (TRCM) and stoplog gates