Extension of Masjed Soleyman hydro power plant

portfolio
portfolio
Project Info
  • Client: Iran Water & Power Resources Development Co.
  • Main Contractor: Farab
  • Location: Khuzestan, Iran
  • Scheme: EPC
  • Scope: Electromechanical & hydromechanical equipment
  • Progress: Completed
  • Capacity: 1,000 MW (4 Units of 250 MW)
  • Type of power house: Underground
  • Average annual power generation: 3700 GWh
  • Main equipment:
    • Turbine: Vertical Francis, 187.5 rpm, 700 tons each
    • Generator: Synchronous type, 15.75 KV
    • Butterfly valve: 5.3 m inner outlet dimameter
    • Governor: Digital type with digital backup governors, 75 bar
    • Generator busduct: Insulated phase busducts, 11.5 KA
    • Transformer: Single phase step up transformers, 94 MVA
    • Hydraulic steel structure: Flap gates with steel lining
    • SF6 switchgear: 2×400 KV three phase circuits

Role of Farab Equipment Manufacturing Co.

  • Material Supply and Local Manufacturing Management of:
    • Turbine (Draft tube, pit liner, spiral case, stay ring, bottom ring, head cover, operating ring, wicket gate & lever, Shaft)
    • Inlet valve (Valve case, valve disk, valve disk trunnion, up & down stream pipe, pressure vessel)
    • Governor pressure vessel and hydraulic piping system