Gholshar-Hashtgerd Urban Metro

Project Info
  • Client: Hashtgerd New Town Construction Co.
  • Main Contractor: Farab
  • Location: Alborz, Iran
  • Scheme: EPC
  • Progress: Under construction
  • General Specification:
    • Length: 25 km
    • Type: Surface
    • Passenger stations: 1
    • Line capacity: 28,000 passengers per hour per direction
    • Headway: 300 sec.
  • Main equipment:
    • Signaling system
    • Communication system
    • Control & SCADA
    • Automatic fare collection (AFC)
    • Power supply included:
      • Overhead contact system (OCS): 50 Km
      • Auto transforming post & sectioning post: 3 units
      • Auto transformer: 6 units
      • Lighting & power substations (LPS): 7 units
    • Tunnel ventilation
    • Fire alarm system
    • Fire extinguishing system
    • Escalators
    • Elevators

Enter your keyword