Gholshar-Hashtgerd Urban Metro
Project Info
-
Client:
Hashtgerd New Town Construction Co.
-
Main Contractor:
Farab
-
Location:
Alborz, Iran
-
Scheme:
EPC
-
Progress:
Under construction
- General Specification:
- Length: 25 km
- Type: Surface
- Passenger stations: 1
- Line capacity: 28,000 passengers per hour per direction
- Headway: 300 sec.
- Main equipment:
- Signaling system
- Communication system
- Control & SCADA
- Automatic fare collection (AFC)
- Power supply included:
- Overhead contact system (OCS): 50 Km
- Auto transforming post & sectioning post: 3 units
- Auto transformer: 6 units
- Lighting & power substations (LPS): 7 units
- Tunnel ventilation
- Fire alarm system
- Fire extinguishing system
- Escalators
- Elevators