Hydromechanical equipment of Shahriar dam

Project Info
  • Client: East Azerbaijan Regional Water Authority
  • Main Contractor: Farab
  • Location: East Azerbaijan, Iran
  • Scheme: EPC
  • Scope: Hydromechanical gates and equipment of Dam & Watercourse
  • Progress: Completed
  • Specification:
    • Spillway Structures: 540 tons
    • Dam Equipment:
      • Diversion gate equipment
      • Spillway stoplogs
      • Bottom outlet
      • Irrigation equipment
      • Intake equipment

Role of Farab Equipment Manufacturing Co.

  • Design, Material Supply and Manufacturing Management of:
    • Spillway radial gates
    • Spillway Stop log gate
    • Spillway lifting beam
    • Bottom outlet maintenance gate
    • Bottom outlet maintenance emergency gate and casing
    • Bottom outlet steel lining
    • Irrigation include pipe, Y branch and reducer
    • Several type of gantry and overhead cranes
    • Types of roller and slide gates
    • Hydraulic servomotors
    • Irrigation and power inside steel lining
    • Electrical and control equipment

Role of Farab Construction Co.

  • Installation of hydromechanical equipment

Enter your keyword