Karoun 1 hydro power plant

Project Info
  • Client: Khuzestan Water & Power Authority
  • Main Contractor: Farab
  • Location: Khuzestan, Iran
  • Scheme: EPC
  • Scope: Electromechanical & hydromechanical equipment
  • Progress: Completed
  • Capacity: 1,000 MW (4 Units of 250 MW)
  • Type of power house: Underground
  • Average annual power generation: 4000 GWh
    • Main equipment:
    • Turbine: Vertical Francis, 187.5 rpm, 650 tons each
    • Generator: Synchronous type, 15.75 KV
    • Butterfly valve: 5 m inner outlet dimameter, 275 tons each unit
    • Governor: Digital type with digital backup governors, 70 bar
    • Transformer: Single phase step up transformers, 100 MVA
    • Hydromechanical equipment: Gates, penstock, steel lining, trash rack and related equipment
    • Crane: 2 power house main cranes, 320 tons each