Kouhrang hydro power plant
Project Info
-
Client:
Iran Water & Power Resources Development Co.
-
Main Contractor:
Farab
-
Location:
Chaharmahal and Bakhtiari, Iran
-
Scheme:
EPC
-
Scope:
Engineering, procurement, construction and commissioning, excluding engineering and procurement of main equipment
-
Progress:
Completed
- Specification
- Capacity: 39.3 MW (3 units of 13.1 MW)
- Type of power house: Surface
- Average annual power generation: 128 GWh
- Main equipment:
- Turbine: Vertical Francis, 500 rpm, 30 tons each
- Generator: Synchronous type, 3.6 KV
- Butterfly valve: 2.5 m inner outlet diameter
- Governor: Digital type with digital backup governors, 60 bar
- Transformer: Three phase step up transformers, 25 MVA
- Crane: Two power house main cranes, 32 tons each