Kouhrang hydro power plant

Project Info
  • Client: Iran Water & Power Resources Development Co.
  • Main Contractor: Farab
  • Location: Chaharmahal and Bakhtiari, Iran
  • Scheme: EPC
  • Scope: Engineering, procurement, construction and commissioning, excluding engineering and procurement of main equipment
  • Progress: Completed
  • Specification
    • Capacity: 39.3 MW (3 units of 13.1 MW)
    • Type of power house: Surface
    • Average annual power generation: 128 GWh
    • Main equipment:
      • Turbine: Vertical Francis, 500 rpm, 30 tons each
      • Generator: Synchronous type, 3.6 KV
      • Butterfly valve: 2.5 m inner outlet diameter
      • Governor: Digital type with digital backup governors, 60 bar
      • Transformer: Three phase step up transformers, 25 MVA
      • Crane: Two power house main cranes, 32 tons each