Masjed Soleyman hydro power plant
Project Info
-
Client:
Iran Water & Power Resources Development Co.
-
Main Contractor:
Farab
-
Location:
Khuzestan, Iran
-
Scheme:
EPC
-
Scope:
Electromechanical & hydromechanical equipment
-
Progress:
Completed
- Capacity: 1,000 MW (4 Units of 250 MW)
- Type of power house: Underground
- Average annual power generation: 3700 GWh
- Main equipment:
- Turbine: Vertical Francis, 187.5 rpm, 700 tons each
- Generator: Synchronous type, 15.75 KV
- Butterfly valve: 5.3 m inner outlet diameter
- Governor: Digital type with digital backup governors, 60 bar
- Generator busduct: Insulated phase busducts, 15.75 KV and 11.5 KA
- Transformer: Single phase step up transformers, 94 MVA
- Hydraulic steel structure: Flap gates with steel lining, 700 tons
- SF6 switchgear: Three phase circuits, 2×400 KV