Sardasht hydro power plant

Project Info
  • Client: Iran Water & Power Resources Development Co.
  • Main Contractor: Farab
  • Location: West Azerbaijan, Iran
  • Scheme: EPC
  • Scope: Electromechanical & hydromechanical equipment, power house civil works
  • Progress: Completed
  • Specification:
    • Capacity: 150 MW (3 Units of 50 MW)
    • Type of power house: Surface
    • Average annual power generation: 422 GWh
    • Main equipment:
      • Turbine: Horizontal Francis, 428 rpm
      • Generator: Synchronous type, 13.8 KV
      • Butterfly valve: 2.6 m inner outlet diameter
      • Governor: Electrohydraulic type governors, 60 bar
      • Transformer: Three phase step up transformers, 132 KV, 60 MVA
      • Switchyard: 63 KV
      • Crane: One power house main crane, 120 tons

Role of Farab Equipment Manufacturing Co.

  • Material supply and manufacturing management of turbine
  • Design, material supply, manufacturing management and installation of diversion intake roller gates and draft tube stoplog gates
  • Design, procurement and installation of crane

Role of Farab Construction Co.

  • Installation of electromechanical & hydromechanical equipment, precommissioning and commissioning