- Power plant specification:
- Capacity at ISO conditions: 480MW (3 Units of 160 MW)
- Fuel type: Natural gas
- Grid voltage: 400 KV
- Site conditions:
- Altitude: 100 m.a.s.l
- Ambient temperature: 2-48° C
- Relative humidity: 65 – 100%
- Water desalination specification:
- Design capacity: 8,000 m3/day
- No. of units: 3*2,667 m3/day
- Sections:
-
- See water intake:
- Sea water transfer pumps
- Sea water coarse filters
- Surge tank
- Air compressor packages
- Air dryer package & air receiver tank for instrument air
- MED-TVC units:
- Three MED-TVC units each with a net production capacity of 2,667 m3/day
- Chemical dosing packages
- Let down station for required LP steam for MED units
- Supplying of required utilities
- Pipe line:
- 6 km pipe line from intake to power plant and also 6 km return line
- Water box at shore with 500 m pipe line into sea to distribute return brine from MED units (based on environmental studies)
- See water intake:
Project Info
- Client: Pars Oil & Gas Co.
- Main Contractor: Farab
- Location: Bushehr, Iran
- Scheme: EPC
- Scope: Electromechanical equipment
- Progress: Under construction
Role of Farab Equipment Manufacturing Co.
- Procurement of:
- Steam duct
- CRT tanks
- Power cables
- Instrument cables
- Cable trays
- LV power distributors
- Transformers
- LV busduct
- Lightening system
- Grounding and protection system
- Field junction boxes
- Marshaling cabinets
- Thermal insulation
- Expansion joints
- Pipes, flanges, fittings and supports
- Hoists
- Instrumentation and Hook-up
- Cranes
- HRSG harp liftings
- HRSG Steel structure
- Desalination tanks
- Management contracting of HRSG manufacturing
- Shipment management of HRSG Stacks
- Procurement and installation of steel structure
Role of Farab Construction Co.
- Civil works, installation of electromechanical equipment
Role of Farab Operations and Maintenance Co.
- Power plant commissioning