Tehran-Tabriz underground railway

Project Info
  • Client: Islamic Republic of Iran Railways
  • Main Contractor: Farab
  • Location: Tehran, Iran
  • Scheme: EPC
  • Scope: Electromechanical equipment
  • Progress: Under construction
  • General Specification:
    • Length: 10 km
    • Type: Underground
    • Passenger stations: 1
    • Line capacity: 28,000 passengers per hour per direction
    • Headway: 300 sec.
  • Main equipment:
    • Signaling system
    • Communication system
    • Control & SCADA
    • Power supply included:
      • PP: 2 units
      • Lighting & power substations (LPS): 7 units
    • Ventilation
    • Fire alarm system
    • Fire extinguishing system
    • DWP (De-watering pumps)

Role of Farab Construction Co.

  • Installation of electromechanical equipment

Enter your keyword