Projects

The third and final phase of BandarAbbas desalination plant was inaugurated by order of the President via video conference

The third and final phase of BandarAbbas desalination plant was inaugurated by order of the President via video conference

The third and final phase of desalination plant 100,000 m3, with 60,000 m3 was inaugurated by the order of the President via video conference, on April 29(2021) in Bandar Abbas. According to Public Relations of Farab Co., The contractor of this project, is «Shaya» Consortium includes Farab Co. , Tana Energy Co., Tiv Energy Co., […]

Read more
Uma Oya Multipurpose Project was Awarded Certificate of Appreciation as the Finalist by ITA

Uma Oya Multipurpose Project was Awarded Certificate of Appreciation as the Finalist by ITA

According to the International Tunneling and Underground Space Association (ITA), Uma oya Multipurpose Project was among the four finalists selected for the € 50 million to € 500 million project in 2020. According to Public Relations of Farab Co., the International Tunneling and Underground Space Association (ITA), evaluated 54 volunteer projects in 8 sections, which […]

Read more
The 618 m Vertical Shaft of UMA OYA Multipurpose Project Was Introduced as the Premier Concrete Project

The 618 m Vertical Shaft of UMA OYA Multipurpose Project Was Introduced as the Premier Concrete Project

The 618 m Vertical Shaft of UMA OYA Multipurpose Project in Sri Lanka by Farab Contracting was introduced and appreciated as “the Premier Concrete Project” by Board of directors of American Concrete Institute (ACI) – Iran Chapter and Concrete Research Center. According to Public Relations of Farab Co., at the ACI Iran Chapter 23rd Annual […]

Read more
Inaugurating Milad Tower Station in Tehran Metro Line 7 by Permission of the President via video conference

Inaugurating Milad Tower Station in Tehran Metro Line 7 by Permission of the President via video conference

Milad Tower station in Tehran Metro line 7 was operated by permission of the President “Hasan Rouhani” via video conference on Thursday, 17th December (2020). According to Public Relations of Farab Co., Tehran Metro line 7, includes 22 stations with 27km length. Farab Co. is EPC contractor of equipment, executing and supplying of this project. […]

Read more
Appreciation of Farab Co. as “The Top Company Active in the Development of Small Hydro Power Plants”

Appreciation of Farab Co. as “The Top Company Active in the Development of Small Hydro Power Plants”

Farab Company was introduced as the “Top Company Active in the Development of Small Hydro Power Plants” in the 2nd Iran Renewable Energy Award and succeeded in receiving a statue and a plaque of appreciation. According to Public Relations of Farab Co., In the 2nd Iran Renewable Energy Award, which coincides with the 5th International […]

Read more
Inaugurating the Second unit of gas of  Dalahoo Combined Cycle Power Plant in Kermanshah by order of the President via video conference

Inaugurating the Second unit of gas of Dalahoo Combined Cycle Power Plant in Kermanshah by order of the President via video conference

The Second unit of gas of  Dalahoo Combined Cycle Power Plant in Kermanshah, was operated by permission of the President “Hasan Rouhani” via video conference at the project site on Thursday, 3rd September (2020). According to Public Relations of Farab Co., Dalahoo CCPP has a nominal capacity of 910 MW and consists of two 310-MW […]

Read more
1 2 4

Enter your keyword