Daryan hydro power plant

Project Info
  • Client: Iran Water & Power Resources Development Co.
  • Main Contractor: Farab
  • Location: Kermanshah, Iran
  • Scheme: EPC
  • Scope: Electromechanical & hydromechanical equipment, power house civil works
  • Progress: Completed
  • Specification:
    • Capacity: 210 MW (3 Units of 70 MW)
    • Type of power house: Surface
    • Average annual power generation: 500 GWh
    • Main equipment:
      • Turbine: Vertical Francis, 250 rpm
      • Generator: Synchronous type, 13.8 KV
      • Butterfly valve: 3.65 m biplane double scales inlet valves
      • Governor: Electrohydraulic governors, 60 bar
      • Generator busduct: Isolated phases busduct
      • Transformer: Three phase step up transformers, 83.5 MVA
      • Switchyard: 230 KV
      • Crane: One power house main crane, 210 tons

Role of Farab Equipment Manufacturing Co.

  • Material supply and manufacturing management of turbine and generator equipment
  • Design, material supply, manufacturing management and installation of draft tube stoplog gates
  • Design, procurement and installation of crane

Role of Farab Construction Co.

  • Installation of electromechanical & hydromechanical equipment, precommissioning and commissioning

Role of Farab Operations and Maintenance Co.

  • Power plant operation, maintenance and repair

Related News

Daryan HPP has identified as silver winner