Khodaafarin hydro power plant

Project Info
  • Client: Regional Water Company of East Azerbaijan
  • Main Contractor: Farab
  • Location: East Azerbaijan, Iran
  • Scheme: EPC
  • Scope: Electromechanical & hydromechanical equipment, power house civil works
  • Progress: Under construction
  • Specification:
    • Capacity: 102 MW (2 Units of 51 MW)
    • Type of power house: Surface
    • Average annual power generation: 250 GWh
    • Main equipment:
      • Turbine: Horizontal Kaplan, 166.5 rpm
      • Generator: Synchronous type, 10.5 KV
      • Butterfly valve: 0.6 m inner outlet diameter, 185 tons
      • Governor: Digital turbine governors, 60 bar
      • Generator busduct: Isolated phases busducts
      • Transformer: Three phase step up transformers
      • Switchyard: 230 KV
      • Crane: One power house main crane, 220 tons

Role of Farab Equipment Manufacturing Co.

  • Design and manufacturing management of inlet valve and accessories