Signing a Contract on Design, Manufacturing, and Delivery of Butterfly valve of Khoda Afarin Hydro Power Plant

Signing a Contract on Design, Manufacturing, and Delivery of Butterfly valve of Khoda Afarin Hydro Power Plant

Design, manufacturing, and delivery contract of Butterfly Valve of Khoda Afarin Hydro Power Plant was signed between managing directors of Farab Co. and Slovenian LITOSTROJ Power Co.

According to Public Relations of Farab Co., on the sidelines of the Iran-Slovenia business conference, which was held on 22 November 2016, the contract was signed in the Chamber of Commerce, Industries, Mines and Agriculture of Iran with the presence of »Borut Pahor«, President of the Republic of Slovenia; »Gholamhossein Shafeii«, Chairman of Iran’s Chamber of Commerce, Industries, Mines and Industries; »Hamid Chitchian«, Minister of Energy; High-rank economic delegation of Slovenia; and more than 350 of economic activists of the two countries.

In this conference, four deeds of contract and cooperation between Iranian and Slovenian companies was signed by Engineer »Mehran Lotfi«, managing director of Farab Co., and managing director of Slovenian LITOSTROJ Power Co., to conduct joint projects in the fields of energy, industrial equipment and valves, airport development and electronic banking, including design, manufacturing, and delivery contract of Butterfly Valve of Khoda Afarin Dam and Power Plant, as well.

Farab Co. is E.P.C contractor for construction of Khoda Afarin 100 MW HPP located in East Azarbayjan Province, 80 km west of the Aslandooz City, on Aras River.

 

Related Posts

Enter your keyword