Tehran-Parand Urban railway line (Imam airport)

Project Info
  • Client: Tehran Urban & Suburban Railway Co. (TUSRC)
  • Main Contractor: Farab
  • Location: Tehran, Iran
  • Scheme: EPC
  • Scope: Electromechanical equipment
  • Progress: Under construction
  • General Specification:
    • Length: 52 km
    • Passenger stations: 5
    • Line capacity: 24,000 passengers per hour per direction
    • Headway: 360 sec.
  • Main equipment:
    • Signaling system
    • Control & SCADA
    • Communication system
    • Automatic fare collection (AFC)
    • Power supply included:
      • High voltage substation (HVS): 2 units
      • Traction rectifier substation (TRS): 15 units
      • Lighting & power substations (LPS): 14 units
      • Third rail system: 120 km
    • Ventilation
    • Fire alarm system
    • Fire extinguishing system
    • Escalators
    • Elevators

Role of Farab Equipment Manufacturing Co.

  • Local manufacturing management of electrification equipment (3rd rail)

Role of Farab Construction Co.

  • Installation of electromechanical equipment