Archives

Utility units of phases 22, 23 & 24 in South Pars gas field

Utility units of phases 22, 23 & 24 in South Pars gas field

The following units of phases 22, 23 and 24 in south pars gas fiels development are included in the project scope of work: Unit 120: Electrical power distribution Unit 121: Steam generation & distribution Unit 123: Instrument & service air system Unit 124: Nitrogen generation Unit 126B: Sea water desalination distribution network Unit 127: Polishing [...]
Read more
Shirkouh combined cycle power plant

Shirkouh combined cycle power plant

Specification: Capacity at ISO conditions: 484 MW (2 Units of 160 MW & 1 Unit of 164 MW) Fuel type: Natural gas Grid voltage: 33 KV Site conditions: Altitude: 1180 m.a.s.l Ambient temperature: 18° C Relative humidity: 32% Role of Farab Construction Co. Civil works Design, procurement and construction of storage tanks Installation, precommissioning and [...]
Read more
Azad hydro power plant

Azad hydro power plant

Specification: Capacity: 10 MW (3 Units of 3.3 MW) Type of power house: Surface Average annual power generation: 51.4 GWh Main equipment: Turbine: Horizontal Francis, 1000 rpm Generator: Synchronous type, 6.3 KV Butterfly valve: 0.8 m inner outlet diameter Governor: Electrohydraulic governors, 76 bar Transformer: Three phase step up Transformers, 63 KV Switchyard: 63 KV [...]
Read more
Gavoshan hydro power plant

Gavoshan hydro power plant

Specification: Capacity: 4.6 MW (2 Units of 2.3 MW) Type of power house: Surface Main equipment: Turbine: Horizontal Francis Generator: Synchronous type, 6.3 KV Butterfly valve: Flange type, 1.4 m and 0.8 m inner outlet diameter Governor: Digital electrohydraulic governors, 70 bar Transformer: Oil type transformers, 1.1 MVA and 3.9 MVA Hydraulic steel structure: Only […]

Read more
Kharg NGL utility units

Kharg NGL utility units

This project provides following subsystems in Kharg Island: Steam generator Instrument air system Nitrogen system Fuel gas system Water treatment Diesel syetm Fire water system HC close drain Oily water system Gas turbine generation Common systems The project has been suspended by the client since 2013. Role of Farab Equipment Manufacturing Co. Management contracting of [...]
Read more
Parsian gas turbine power plant

Parsian gas turbine power plant

Specification: Capacity at ISO conditions: 120 MW (4 Units of 30 MW) Fuel type: Natural gas Substation: 20 KV, 11 KV Role of Nardis Energy Projects Co. Design, procurement and installation of gas pressure reduction station Role of Farab Construction Co. Civil works Installation of electromechanical equipment, precommissioning and commissioning Role of Farab Operations and [...]
Read more
Foroozan offshore complex renovation and reconstruction

Foroozan offshore complex renovation and reconstruction

Scope of work: Renovation and reconstruction of Foroozan offshore facilities including FY, FZ, F16, FX and F15 platforms and their relevant equipment and systems including: Seperators Turbo pumps and generators Oily and sewege water treatment system Potable water system Fire water system Instrument and plant air system Falre systems Well head control panel Crane DCS, […]

Read more
Iran LNG gas treating unit

Iran LNG gas treating unit

Iran LNG plant is located on the west coast of South Pars Gas Field Development, at Tombak. Two parallel LNG trains with a total production of more than 10 MMTPA of LNG will be installed. In addition to LNG, the plant will produce LPG, condensate and sulfur. The feed gas will be supplied from the [...]
Read more
Uma Oya multipurpose development project

Uma Oya multipurpose development project

Specification: Capacity: 120 MW (2 Units of 60 MW), 145mcm/ year trans basin water conveyance Type of power house: Underground Average annual power generation: 290 GWh Main equipment: Turbine: Vertical Pelton, 600 rpm Generator: Synchronous type, 10.5 KV Inlet valve: Spherical, 1.1 m inner outlet diameter Governor: Hydraulic with digital PID controller Transformer: Three phase [...]
Read more
Sirri Island gas turbine power plant

Sirri Island gas turbine power plant

Specification: Capacity at ISO conditions: 26 MW (2 Units of 13 MW) Fuel type: Natural gas Grid voltage: 33 KV Site conditions: Altitude: Sea level Ambient temperature: 46° C Relative humidity: 92% Role of Farab Construction Co. Construction and civil works Installation of electromechanical equipment, precommissioning and commissioning
Read more

Enter your keyword